The whole line
One proposal, one layout and one point of contact, from the first step to the last. When something stops, you make one call. Your team goes back to running production instead of managing suppliers.
Solutions
We design, source, integrate and support turnkey packaging lines for food and consumer goods plants. Each line is built around your product, your speed and your budget, from the first empty container to the full pallet.
Turnkey packaging lines designed around your product, speed and budget. One team to integrate and support every step, from the first container to the full pallet.
Your product and target speed are enough to start.
2:14pm
Containers pile up before the capper. Production is watching the clock.
The filler supplier checks the filler. Nothing wrong on their side. The capper supplier checks the capper and says the same. Both are right.
The problem lives in the space between the two machines. Nobody quoted that space, so nobody owns it. And your team ends up as the integrator, without ever signing up for the job.
For consumer goods manufacturers, a lost hour now costs at least $36,000.1
A machine is a purchase. A line is a project, and projects need an owner.
¹ Siemens, The True Cost of Downtime 2024, figure for Fast Moving Consumer Goods.
A complete line has eight steps. Some projects need all of them, some need three. Each one has to be sized for the step before it and the step after it.
01Unscramble
Conveying, inspection and controls run through all eight steps. That is where most lines lose time.
Shown: a rigid container line. Bag, pouch, tray and flow wrap lines follow the same logic with different machines.
One proposal, one layout and one point of contact, from the first step to the last. When something stops, you make one call. Your team goes back to running production instead of managing suppliers.
We start from what you pack, how fast you need it and what you can invest. Then we choose the equipment that fits each step. You get options with the trade-offs explained, instead of one catalog.
The people who design and install your line work out of Lakeland, Florida. The same people train your operators and pick up the phone after start-up.
Every project starts with four things: your product, your speed, your floor and your budget. Only then do we choose the equipment for each step, from a base of qualified manufacturers.
Then we integrate the whole line and stay with it. Since 2017 the goal has stayed the same: efficient, cost-effective lines that keep running long after start-up.
How we workYour product, target speed, floor and budget. One conversation, and samples if you have them.
Layout and sizing of every step, so nothing waits and nothing starves.
Each machine chosen for your product and your budget, with the options explained.
Machines, conveying and controls set up to work as one line.
Installed on your floor. Our technicians test the equipment, run it with your product and work through troubleshooting with your maintenance team.
Operators trained before the line goes into live production, spare parts planned, and support for the life of the equipment.
Need one step, not a whole line? Many projects start there. We plan that step to fit the line you have today and the one you plan to have.
Weighing, filling, bagging, flow wrapping, capping and sealing, matched to how your product behaves.
See this stepMetal detection, checkweighing and reject systems that protect your product, your brand and your give-away.
See this stepLabels, dates and lot codes applied and verified at line speed.
See this stepCartons, bundles and multipacks in the format your retailer asks for.
See this stepCase erecting, packing, sealing and palletizing, the steps that set how fast product leaves your plant.
See this stepUnscramblers, conveyors, accumulation and transfers. The space between the machines.
See this stepOur lines and equipment run in confectionery, snack and food plants across the United States, including plants of global brands such as Hershey and Mondelez.
Start-up and operator training on your floor. Spare parts planned before you need them. Upgrades when you add a format or need more speed. And a support line that reaches the people who built your line.
Request service or partsWhat it is, how it behaves and what it goes into. Samples help.
Units per minute now and where you plan to be. A line is sized for both.
The space available, the machines that stay, where product comes in and where it leaves.
A real range and a real date let us choose equipment that fits both.
With these four, we can design a line. Without them, all anyone can send you is a brochure.
No. Many projects start with the one step that holds the others back. We plan the whole line on paper, then build it one step at a time, so each new machine connects to what you already run and to what comes next.
We select equipment project by project from a base of qualified manufacturers. Nobody’s catalog decides for us, so the recommendation comes from your product, your speed and your budget. Specific models and specifications come in your proposal.
Every step of the line, and the conveying and controls that connect them, written out before you sign: equipment, installation, start-up and training. The space between the machines is in the scope from the first draft, so it does not come back later as a change order.
Good. Your engineers know your product and your plant better than anyone. We work with them. They set the requirements; we take on the sourcing, the integration between machines and the support after start-up, so your team is not tied to one line for the next ten years.
No. Your line comes with the documentation for its equipment, and we help you plan which spare parts to keep on your shelf. We support the line for the life of the equipment, and you decide how much of that support you need.
Yes. We map what stays on your floor and size the new steps around it, including the conveying and controls that connect them.
Us. The team that integrated your line is the team you call, by phone, email or WhatsApp. Parts go out by overnight courier, by post or with a technician, depending on how urgent it is.
Yes. Our technicians test the equipment on your floor, run it with your product and work with your maintenance staff on troubleshooting. Operator training is completed before the line goes into live production.
Free repairs and machine parts for one year after installation. After that, we keep supporting your line for the life of the equipment.
It depends on how many steps the line has and on equipment lead times. Your proposal comes with a schedule, step by step.
We are based in Lakeland, Florida, and install and support lines across the United States.
Your product and your target speed. If you also have your floor space, your budget and your deadline, the first answer gets much more specific.
Send us your product and target speed. We will map the line and tell you where we would start.