InMotion Solutions | Home - InMotion Solutions
Packaging line integrator · Lakeland, Florida

One partner.
The whole line.

We design, source, integrate and support turnkey packaging lines for food and consumer goods plants. Each line is built around your product, your speed and your budget, from the first empty container to the full pallet.

Turnkey packaging lines designed around your product, speed and budget. One team to integrate and support every step, from the first container to the full pallet.

Tell us about your line

Your product and target speed are enough to start.

Watch the line run
LINE IN MOTION / LIVE DEMO RUNNING
01 FILL02 CAP03 SEAL
  • Lakeland, Florida, since 2017
  • Lines and equipment running in Hershey and Mondelez plants
  • Start-up and support by the same team

2:14 pm. The line is down, and every supplier says their machine is fine.

Containers pile up before the capper. Production is watching the clock.

The filler supplier checks the filler. Nothing wrong on their side. The capper supplier checks the capper and says the same. Both are right.

The problem lives in the space between the two machines. Nobody quoted that space, so nobody owns it. And your team ends up as the integrator, without ever signing up for the job.

  • Hours of downtime while each company proves it was not them
  • A line that runs at the speed of its slowest step, whatever the spec sheets say
  • Several phone numbers to call when something stops

For consumer goods manufacturers, a lost hour now costs at least $36,000.1

A machine is a purchase. A line is a project, and projects need an owner.

¹ Siemens, The True Cost of Downtime 2024, figure for Fast Moving Consumer Goods.

From empty container to full pallet

A complete line has eight steps. Some projects need all of them, some need three. Each one has to be sized for the step before it and the step after it.

INTERACTIVE LINE DEMO Swipe or tap to explore
LIVE MACHINE VIEW

  1. 01 Unscramble: A container unscrambling table turns empty containers the right way up and feeds them onto the line in a steady row. If they arrive unevenly, everything after waits. Conveying & Auxiliary
  2. 02 Weigh and fill: A multihead weigh filler drops the right amount of product into each container. Accuracy here decides how much product you give away. Primary Packaging
  3. 03 Cap: A rotary chuck capper places each cap and tightens it to the right torque. Too loose and it leaks. Too tight and it cracks. Primary Packaging
  4. 04 Induction seal: An induction sealer bonds the foil liner under the cap, the seal that tells the consumer nobody opened it. Primary Packaging
  5. 05 Label: A container labeler applies the label in the same place on every unit. Date and lot coding and inspection can be added at this point. Coding & Labeling / Inspection & Checkweighing
  6. 06 Carton: A vertical cartoner loads the units into cartons and closes them, in the format your retailer asks for. Secondary Packaging
  7. 07 Case erect, pack and seal: One all-in-one machine erects the shipping case, loads it and seals it. End of Line & Palletizing
  8. 08 Palletize: A robotic palletizer stacks the cases on the pallet inside a safety cell, ready to wrap and ship. End of Line & Palletizing

Conveying, inspection and controls run through all eight steps. That is where most lines lose time.

Shown: a rigid container line. Bag, pouch, tray and flow wrap lines follow the same logic with different machines.

Which step is holding your line back? Tell us.

What changes when one team owns the line

The whole line

One proposal, one layout and one point of contact, from the first step to the last. When something stops, you make one call. Your team goes back to running production instead of managing suppliers.

Your product first

We start from what you pack, how fast you need it and what you can invest. Then we choose the equipment that fits each step. You get options with the trade-offs explained, instead of one catalog.

A team you can reach

The people who design and install your line work out of Lakeland, Florida. The same people train your operators and pick up the phone after start-up.

We start with what you pack, not with what we have to sell.

Every project starts with four things: your product, your speed, your floor and your budget. Only then do we choose the equipment for each step, from a base of qualified manufacturers.

Then we integrate the whole line and stay with it. Since 2017 the goal has stayed the same: efficient, cost-effective lines that keep running long after start-up.

How we work

From the first message to pallets leaving the dock

  1. 01

    Brief

    Your product, target speed, floor and budget. One conversation, and samples if you have them.

  2. 02

    Line design

    Layout and sizing of every step, so nothing waits and nothing starves.

  3. 03

    Equipment selection

    Each machine chosen for your product and your budget, with the options explained.

  4. 04

    Integration

    Machines, conveying and controls set up to work as one line.

  5. 05

    Installation and start-up

    Installed on your floor. Our technicians test the equipment, run it with your product and work through troubleshooting with your maintenance team.

  6. 06

    Training and support

    Operators trained before the line goes into live production, spare parts planned, and support for the life of the equipment.

Lines running in plants that cannot afford to stop

Our lines and equipment run in confectionery, snack and food plants across the United States, including plants of global brands such as Hershey and Mondelez.

  • Bakery
  • Confectionery
  • Snacks
  • Meat & Poultry
  • Frozen & IQF
  • Powders & Granules
  • Liquids & Sauces
  • Pharma & Nutraceutical

See how a turnkey project works

HersheyMondelez

A line is delivered when your team runs it without us

Start-up and operator training on your floor. Spare parts planned before you need them. Upgrades when you add a format or need more speed. And a support line that reaches the people who built your line.

Request service or parts

Four things make a better quote

Your product and its container

What it is, how it behaves and what it goes into. Samples help.

Your speed, today and in three years

Units per minute now and where you plan to be. A line is sized for both.

Your floor

The space available, the machines that stay, where product comes in and where it leaves.

Your budget and deadline

A real range and a real date let us choose equipment that fits both.

With these four, we can design a line. Without them, all anyone can send you is a brochure.

Questions buyers ask us first

Do I need to replace my whole line?

No. Many projects start with the one step that holds the others back. We plan the whole line on paper, then build it one step at a time, so each new machine connects to what you already run and to what comes next.

Which equipment brands do you work with?

We select equipment project by project from a base of qualified manufacturers. Nobody’s catalog decides for us, so the recommendation comes from your product, your speed and your budget. Specific models and specifications come in your proposal.

What is in the proposal?

Every step of the line, and the conveying and controls that connect them, written out before you sign: equipment, installation, start-up and training. The space between the machines is in the scope from the first draft, so it does not come back later as a change order.

We have our own engineers. Why work with an integrator?

Good. Your engineers know your product and your plant better than anyone. We work with them. They set the requirements; we take on the sourcing, the integration between machines and the support after start-up, so your team is not tied to one line for the next ten years.

Will we be locked in to you for support?

No. Your line comes with the documentation for its equipment, and we help you plan which spare parts to keep on your shelf. We support the line for the life of the equipment, and you decide how much of that support you need.

Can you integrate with machines I already have?

Yes. We map what stays on your floor and size the new steps around it, including the conveying and controls that connect them.

Who do I call when something stops?

Us. The team that integrated your line is the team you call, by phone, email or WhatsApp. Parts go out by overnight courier, by post or with a technician, depending on how urgent it is.

Do you test the line before production starts?

Yes. Our technicians test the equipment on your floor, run it with your product and work with your maintenance staff on troubleshooting. Operator training is completed before the line goes into live production.

What does the warranty cover?

Free repairs and machine parts for one year after installation. After that, we keep supporting your line for the life of the equipment.

How long does a line project take?

It depends on how many steps the line has and on equipment lead times. Your proposal comes with a schedule, step by step.

Where do you work?

We are based in Lakeland, Florida, and install and support lines across the United States.

What do you need from me to start?

Your product and your target speed. If you also have your floor space, your budget and your deadline, the first answer gets much more specific.

What are you packing next?

Send us your product and target speed. We will map the line and tell you where we would start.

New line or one step?

A person on our team reads every brief and gets back to you.

Tell us about your line